FIDIC Glossary

FIDIC contract terms in plain English: what each one means, where it sits in the contract and how it works in practice.

Advance Warning Advance Warning is the duty to warn in advance of events that may delay the Works or increase the price. It was introduced in the FIDIC 2017 edition. We explain who warns of what, and how it differs from a Notice of Claim. Contemporaneous records What contemporaneous records mean under FIDIC, where the Contractor's duty to keep current records sits in the Contract, and how to keep them so that a claim for Extension of Time (EOT) and payment of a Variation stands up. The article sets out the minimum data to capture, the 28- and 84-day deadlines, how the records link to the Notice of Claim, and the typical mistakes that cost the Contractor compensation. DAAB DAAB (Dispute Avoidance/Adjudication Board) is the standing board for avoiding and resolving disputes under FIDIC 2017 contracts. We set out what the term means, where it sits in the contract (Clause 21), how it works in practice, which time limits apply and how it differs from the former DAB. Defects Notification Period The Defects Notification Period is the period after taking over during which the Employer notifies defects and the Contractor remedies them. We explain how long it lasts, how it ends and what the Performance Certificate is. Delay Damages Delay Damages are the pre-agreed sum a contractor pays for each day of late completion. We explain how they are calculated under Sub-Clause 8.8 of FIDIC 2017, where to find the rate and the cap, and how an extension of time affects them. Engineer’s Determination An Engineer’s Determination is the decision by which the Engineer settles a difference between the Parties on a claim or another matter when they have not agreed. We set out the time limits under Sub-Clause 3.7 of the 2017 edition and what to do if you disagree. EOT EOT (Extension of Time) is an extension of the Time for Completion under a FIDIC contract. We explain what the term means, where to find it in the 2017 Red and Yellow Books (Sub-Clauses 8.5 and 20.2), the procedure step by step with its time limits, and the mistakes that cost contractors their entitlement. NOD A NOD is a notice of dissatisfaction with an Engineer's determination or a DAAB decision. Without it the decision becomes final. We explain when and how to give one under FIDIC 2017. Notice of Claim A Notice of Claim is the notice that starts the FIDIC claims procedure and preserves the contractor's entitlement to an EOT and money. We explain the 28-day limit under Sub-Clause 20.2 of the 2017 Red and Yellow Books, how the time bar works and how the Engineer responds. Red Book The FIDIC Red Book is the Conditions of Contract for Construction, used when the design is the Employer's. The Contractor builds to the drawings issued, and payment is made for the quantities actually executed and measured. Silver Book The FIDIC Silver Book is the Conditions of Contract for EPC/Turnkey Projects. The Contractor takes on design, procurement and construction for a fixed price and carries most of the risk. Taking-Over Certificate A Taking-Over Certificate is the certificate by which the Engineer confirms that the Works are complete and taken over by the Employer. It starts the defects period and stops delay damages. We set out the procedure under Sub-Clause 10.1 of FIDIC 2017. Time bar A time bar is a rule under which a party loses its claim if it did not give notice of it in time. We explain which FIDIC 2017 periods work as a time bar and how to stay clear of it. Variation A Variation is a change to the scope or character of the Works under a FIDIC contract. We explain who may initiate it, how an instruction differs from a request for proposal, and what a contractor should do when a change is given orally. Yellow Book The FIDIC Yellow Book is the Conditions of Contract for Plant and Design-Build. The Contractor designs to the Employer's Requirements and is responsible for the Works being fit for their purpose.

Articles and analysis →