Context

Why this project matters

Road projects under the FIDIC Red Book are shaped by measurement, variations, time control, work quality and strict correspondence between the contractor, engineer and employer.

Key parameters

  • Three reconstruction lots within the SRRP programme.
  • 107 km of roads 4R105 and 4R100.
  • ADB financing and application of the FIDIC Red Book.

Bridge Consult expertise focus

  • Control of contractual time limits and notices.
  • Work with quantities, variations and supporting records.
  • Preparation of the contractor’s position in a format expected by the FIDIC engineer.