Construction management: an integrated value chain: production, operation and recycling

The German experience

Explore the topics ↓
19–26 APRIL 2027HALLE (SAALE) / LEIPZIG

Programme topics

  1. Topic 01

    Planning and calculation methods for construction projects

    The proposed meeting with GP Verkehrswegebau on 21 April covers estimating methods for roadworks. How do planners account for crew size and equipment output when planning a shift?

    Placing asphalt pavement
    Placing asphalt pavement
    Mailtosap · CC0
  2. Topic 02

    Urban and municipal planning

    How can a street accommodate the road, utilities and drainage? In Halle, the proposed discussion covers who approves the layout and how access to buildings is maintained.

    Halle market square and tram tracks
    Halle market square and tram tracks
    Robert von Oliva · CC0
  3. Topic 03

    Construction project management

    An active construction site provides a setting to discuss how a contractor sequences the work. A bridge or another civil engineering project is proposed for the visit on 22 April.

    Bridge construction
  4. Topic 04

    Production management and quality management

    The Ammendorf visit on 20 April covers concrete and asphalt production. On 23 April, the proposed BGI Brambach visit focuses on how laboratory staff test materials and interpret the results.

    A concrete delivery at a construction site
    A concrete delivery at a construction site
    Usien · CC BY-SA 3.0
  5. Topic 05

    Effective waste management

    The proposed visit to the Roitzsch landfill covers the acceptance and recording of construction waste. How do staff identify the contents of a load and record its acceptance?

    Roitzsch facility
  6. Topic 06

    Digitalisation (drones)

    20 April · Ammendorf · morning visit

    The proposed Ammendorf visit covers drone surveys of construction sites and the measurement of material volumes. How can survey images be used to calculate a stockpile’s volume and check the result?

    Drone for construction site surveys
  7. Topic 07

    Human resource management, training and development

    Dinner with Uzbek apprentices offers an opportunity to ask how workplace training is organised and what tasks they take on.

    A paving crew and its equipment at work
    A paving crew and its equipment at work
    Wendebaum · CC BY-SA 3.0
  8. Topic 08

    Operation and management of built assets

    The proposed Halle-Diemitz meeting covers road maintenance. How does the maintenance team record a defect, assign a crew and check the repair?

    Expansion joint in the road surface on a bridge in Osnabrück
    Expansion joint on Hamburger Brücke, Osnabrück
    Ramsch · CC BY-SA 4.0
  9. Topic 09

    The role of government in the quality of German roads

    The proposed meeting with Die Autobahn GmbH des Bundes covers federal motorway management. How are responsibilities shared when planning and operating a road?

  10. Topic 10

    Meeting participants in Germany’s construction market

    Proposed meetings bring together materials producers, GP contractors, BGI Brambach and road authorities. With each organisation, discuss its role at a particular stage of a project.

    Organisations and sites ↓

20–23 APRIL · HALLE AND THE REGION

Organisations and sites

These are proposed meetings. The hosts will confirm access, speakers and sites ahead of the visit. Use the official resources below to prepare for each discussion. The questions below are suggested discussion points. Specific examples and demonstrations are subject to agreement with the hosts.

GP Papenburg group film

GP Günter Papenburg AG

The proposed host partner grew from the haulage business Günter Papenburg founded in 1963. The itinerary brings together group businesses working in materials production, infrastructure construction and waste management.

Group history ↗

20 and 23 April

Materials and testing

A concrete specimen under load
A concrete specimen under load · Programme presentation

GP Betonwerke Ost

The Halle-Ammendorf ready-mixed concrete plant is part of the GP production network.

Follow a batch of pavement concrete from aggregate moisture correction to dispatch. Can the delivery ticket be traced to the test results and placement location?

Plant locations ↗

BGI Brambach GmbH

This Halle laboratory tests materials for road construction, earthworks and foundations.

Review a sample test report. Who takes and labels the specimen, who checks the result, and what happens if it differs from the plant laboratory’s findings?

Laboratory profile ↗

20–22 April

Construction sites

Specialist equipment for underground works
Specialist equipment for underground works · Programme presentation

GP Verkehrswegebau GmbH

This Halle-based contractor builds transport infrastructure. The programme proposes a visit to an active road project.

Compare the planned quantity, crew allocation and daily record for one shift. Which measurements substantiate the work completed?

GP road construction ↗

GP Spezialtiefbau GmbH

This specialist geotechnical contractor undertakes projects and supplies specialist equipment.

Explore how ground investigation informs the choice of construction method. Using a site example, discuss which movements are monitored and when readings trigger a change in the works.

Company and equipment ↗

21–22 April

City planning and road operations

Leipziger Straße in Halle, on the proposed walking route for 22 April
Leipziger Straße in Halle, on the proposed walking route for 22 April.
Dguendel · CC BY 4.0

Die Autobahn GmbH des Bundes · Niederlassung Ost

The eastern division is based in Halle. Its remit covers project preparation, construction supervision and motorway operations across the region.

Trace a defect from handover inspection to rectification. Who decides whether the repair is acceptable, and what records reach the maintenance team?

Eastern division ↗

Stadt Halle (Saale)

The municipal department for urban development and planning coordinates city planning in Halle.

Use one street project to examine how utilities, drainage, traffic and access to properties are coordinated before construction starts.

City planning department ↗

Straßenmeisterei Diemitz

The Diemitz road maintenance depot is part of the southern regional division of Saxony-Anhalt’s road authority.

Which defects call for an immediate response? Compare an inspection log, a maintenance crew’s work order and its completion record.

Regional road authority ↗

HASTRA-Service GmbH

This Halle company provides road construction, temporary traffic management, road marking and winter maintenance.

Examine a traffic management plan at a construction phase change. How are barriers and signs moved while maintaining pedestrian routes and equipment access?

HASTRA services ↗

20 April

Waste management

Aerial view of the Roitzsch landfill
Aerial view of the Roitzsch landfill · Programme presentation

GP Papenburg Entsorgung Ost GmbH

The operator of the Class II landfill in Roitzsch accepts specified categories of waste against published criteria.

Trace a load from documentation and weighing to the acceptance decision. Discuss which materials could instead be sent for recycling and how to select a suitable recycling method.

Roitzsch facility ↗
Waste acceptance criteria · PDF (DE) ↓

19–26 APRIL 2027

Daily programme

Organised by BRIDGE CONSULT. GP Günter Papenburg AG is the proposed host partner. Visits are subject to host confirmation. Technical meetings will be interpreted into Russian.

Host profiles and visit resources ↑

19.04

Arrival in Halle

+

Travel via Frankfurt. Onward travel to Halle by train or by air via Leipzig/Halle with a hotel transfer is under consideration. A welcome reception in Halle is proposed for the evening.

20.04

Ammendorf, drone surveying and specialist foundation works

+

Visit the concrete and asphalt plants, truck workshop and materials laboratory, and explore how drones measure material volumes. After lunch, visit the Roitzsch landfill and a GP Spezialtiefbau site. Dinner with Uzbek apprentices follows.

21.04

Road construction and maintenance

+

Visit a GP Verkehrswegebau road project, discuss work-zone traffic management with HASTRA and meet the Halle-Diemitz road maintenance team. The day closes with a review of road projects and estimating methods.

22.04

Motorways, city planning and civil engineering

+

Meet Die Autobahn GmbH des Bundes and Halle’s city planners. In the afternoon, visit a bridge or another civil engineering project with GP Verkehrswegebau.

23.04

BGI Brambach laboratory and Leipzig

+

Discuss construction materials tests and their results with the laboratory team. After the closing meeting with the hosts, travel to Leipzig for lunch and a guided city tour.

24.04

BRIDGE CONSULT workshop

+

10:30–16:30. Each participant selects a practice from one of the visits and prepares a 90-day implementation plan, identifying the first action, the person responsible and a measurable result. Free time after 16:30.

25.04

Free day

+

Free time in Halle.

26.04

Return to Tashkent

+

Transfer to Leipzig/Halle Airport and return via Frankfurt.

Visit materials

Participants will receive the visit materials in Uzbek as a PDF.